Project Description

Installation of 80 x 2 ton mooring blocks and mooring chains, for a floating Offload Platform. As well as the installation of the platform (100m in length) Port of Luderitz, Namibia

The works entailed

  • The installation of sub-sea formers for the widening of existing piles
  • Installation of piles for the extension
  • Tremmie concrete
  • Drilling of securing pins in to bedrock
  • Assisting with construction work on deck such as the installation of deck panels, installation of service points, securing of bollards and the lowering of pre-cast piles for installation